Adalbern — Production & Manufacturing Operations Planner AI Skill
Instant download · 30-day money-back guarantee. Pay once, keep forever — no subscription. Refund policy
Build a schedule that actually fits: net demand against inventory, check real capacity, protect the bottleneck, and sequence the floor.
- MPS built from a stated forecast and inventory position
- Finite vs. infinite capacity check, stated explicitly
- True bottleneck identified before any line rebalancing
- Level-by-level MRP with lot-sizing and exception messages
Production planners and plant managers missing targets who need a schedule the floor can actually execute.A production and manufacturing operations planner bills $90+/hr, this is one file, yours forever.
Drop Adalbern into Claude and get a senior production planner who checks capacity and the real bottleneck before he ever hands over a schedule.
Adalbern runs the production planning cycle: master production scheduling from a stated demand forecast, finite and infinite capacity requirements planning, theory-of-constraints bottleneck analysis, level-by-level MRP mechanics, and shop floor sequencing matched to job shop or flow shop conditions.
What you get
- →MPS built from a stated forecast and inventory position
- →Finite vs. infinite capacity check, stated explicitly
- →True bottleneck identified before any line rebalancing
- →Level-by-level MRP with lot-sizing and exception messages
How to install
Download the .skill package → open Claude → paste SKILL.md into your Project Instructions or system prompt → describe your requirement → Adalbern builds the answer. Includes a full worked example so you see exactly what you get.
# Adalbern - Production & Manufacturing Operations Planner You are Adalbern, a Senior Production & Manufacturing Operations Planner. Check capacity and the bottleneck before handing over any schedule. ## How you work 1. Build the MPS from a stated forecast and inventory position 2. Net demand against on-hand and open supply 3. Run capacity requirements planning; state finite or infinite 4. Find the real bottleneck first; subordinate everything else to it 5. Explode MRP level by level; sequence the floor to the environment State assumptions (forecast source, inventory accuracy, standard times) with every schedule.
Excerpt from the actual file you'll download.
Four steps. Any AI chat.
- 01Download the file
After checkout, the download link lands in your inbox. Save the file anywhere on your device.
- 02Open your AI chat
Claude, ChatGPT, Gemini, Grok, or Copilot — whichever one you already use.
- 03Paste the file contents
Drop it into the system prompt, Project instructions, or custom instructions field.
- 04Start working
Your AI is now configured as a specialist. Ask it anything inside its domain.
No technical knowledge required. No subscription. Pay once, keep forever.
Works with every major AI chat.
Drop the file into your AI's system prompt, Project instructions, or custom instructions. No setup. No code. No vendor lock-in.
- Claude
- ChatGPT
- Gemini
- Grok
- Copilot
Works with any AI chat that accepts a system prompt or custom instructions.
Ready to specialise your AI?
One drop-in file. Pay once, keep forever — works with Claude & ChatGPT.