Gantt Chart Maker Free Gantt chart generator

Turn a task list into a Gantt chart with dependencies, milestones and phase bars. Paste rows from Excel or Google Sheets, let start dates follow dependencies, and export PNG or SVG with no watermark.

  • Free - no sign-up
  • Runs in your browser
  • Paste from Excel / CSV
  • Dependencies + milestones
Samples
# Task Start End Days Depends on Group % Milestone Owner Delete

You can paste several rows from a spreadsheet straight into any cell.

100%

Days are calendar days. Dates: YYYY-MM-DD, MM/DD/YYYY or DD.MM.YYYY.

PNG and SVG are free with no watermark. Save, share links, PDF and PPTX come with All-Access Pro ($9) or Team ($29).

    Go past the timeline

    The chart shows the plan. Delivering it is the job.

    A Gantt chart is only as good as the plan behind it. These AI skills and agents plug into Claude, ChatGPT or any AI chat and help you build, prioritise and run the work.

    What is a Gantt chart maker?

    A Gantt chart shows a project as horizontal bars on a calendar: each task gets a bar from its start to its end, dependencies are drawn as arrows and milestones as diamonds. This free Gantt chart maker builds that diagram from a simple task list. Type tasks into the table or paste them from a spreadsheet, and the online Gantt chart draws itself, including dates for tasks that depend on others.

    It runs fully in your browser, with no sign-up. Your task list stays in this browser (the draft is autosaved locally), and you can export PNG or SVG with no watermark.

    How to make a Gantt chart in four steps

    1. Add tasks. Fill in the table, paste rows from Excel or Google Sheets into the text box, or load a sample project.
    2. Link the work. Put a dependency in the depends column. Tasks without a start date are scheduled automatically after their dependencies finish.
    3. Group and review. Assign tasks to phases to get summary bars, switch between day, week and month scale, and check the today line against your plan.
    4. Export. Download PNG for a status update or SVG for print. Undo and redo cover every edit.

    Input format

    Each row is one task. The columns are task, start, then either end or duration (such as 5d or 2w), plus optional depends, group, progress and milestone. Dates can be written as YYYY-MM-DD, MM/DD/YYYY or DD.MM.YYYY. A dependency can point to a task name, an id or a row number. A milestone is either marked in the milestone column or given a duration of 0.

    task,start,duration,depends,group,progress
    Kickoff,2026-11-02,0,,Plan,100
    Requirements,,1w,Kickoff,Plan,60
    Design,,2w,Requirements,Build,0
    Development,,3w,Design,Build,0
    Testing,,1w,Development,Launch,0
    Go live,,0,Testing,Launch,0

    Only the first task has a date. Every other start date is calculated from the chain of dependencies, so if Requirements slips by a week you change one row and the rest of the plan moves with it.

    What the generator checks for you

    A Gantt diagram generator is only useful if the plan behind it makes sense. The tool warns you about:

    • Invalid dates that cannot be read in any of the supported formats.
    • End before start, which usually means swapped columns or a typo in the year.
    • Circular dependencies, where tasks wait on each other and can never begin.
    • Tasks that start before a dependency ends, a sign that a fixed date no longer fits the plan.

    Gantt scheduling tips

    • Let dependencies drive dates. Fix only the dates that are truly fixed (a kickoff, a launch, a contract deadline) and leave the rest blank so the schedule recalculates itself.
    • Keep tasks between a few days and two weeks. Bars that span months hide risk. Split them into steps someone can finish and report on.
    • Use milestones for decisions and handoffs. Sign-off, go live and budget approval are moments, not tasks, so give them a duration of 0.
    • Group by phase. Summary bars make a long chart readable for stakeholders who only need the big picture.
    • Update progress weekly. Compare progress with the today line: a bar that should be half done but sits at 10% is your early warning.
    • Match the scale to the audience. Day view for the team, week view for the project lead, month view for leadership.

    When to use the free version vs Pro

    The free gantt chart generator covers planning, checking and exporting with no account and no watermark. Your draft is kept only in this browser, so clearing browser data removes it. Pro is for plans you share and keep updating. With the All-Access subscription (Pro $9 per month, Team $29 per month for 5 seats) you can save charts to your account (up to 50 on Pro, 500 on Team), share a read-only link that you can revoke at any time, and export PDF or PPTX (one slide with the chart as a high resolution image), which is handy for steering committee decks.

    Need to show who owns each workstream? Build the team structure in the free Org Chart Builder, or see all free AI tools and generators.

    FAQ

    Is this Gantt chart maker free?

    Yes. You can build, edit and export PNG or SVG for free, with no sign-up and no watermark. Saving to an account, share links, PDF and PPTX export are part of the paid All-Access subscription.

    Can I import tasks from Excel or Google Sheets?

    Yes. Copy rows with task, start, end or duration, depends, group and progress columns and paste them into the text box. Dates can be YYYY-MM-DD, MM/DD/YYYY or DD.MM.YYYY.

    How are dependencies handled?

    Put a task name, id or row number in the depends column and an arrow is drawn between the bars. A task with no start date starts automatically when its dependencies finish.

    Is my project data private?

    The free tool runs fully in your browser and your draft is saved only in this browser. Nothing is stored in an account unless you are on Pro and choose to save the chart.

    How do I export a Gantt chart to PowerPoint or PDF?

    PNG and SVG export are free and work in any slide deck. Pro adds PDF export and PPTX export, which creates one slide with the chart as a high resolution image.