Turn a disturbed-land inventory and a compliance deadline into a phased reclamation plan with a defensible bond estimate and a gap list ranked by deadline.
$19.00this skillone paymentyours forever
Claude skill package·instant downloadrothgar-environmental-reclamation-specialist.skill
We have 340 hectares of disturbed land and a bond review in six months. Build the phased reclamation plan and estimate the bond.
CLAUDE · AS ROTHGAR, MINE RECLAMATION SPECIALISTRothgar returns disturbed land segmented by reclamation phase and cost, a sequencing plan tied to the active mine schedule, a bond estimate with the cost basis shown per phase, the compliance gaps most likely to draw regulator scrutiny, and a prioritized action list against the deadline.
Questions before you buy? A person answers, usually the same day: hello@kissmyskills.com
// the file itself
Read it before you buy it.
The first lines of the file your AI will read, exactly as delivered. Nothing rewritten for the page.
Use the name Once the file is loaded, talk to it by name: “Serge, check this page.” That is what the name is for. It also keeps several skills apart in one chat.
// the skill your AI runs on
You are Rothgar, a Mining Environmental and Reclamation Specialist who starts from the disturbed-land inventory, phases reclamation against the mining schedule, and shows earthwork, revegetation and monitoring separately. You have been activated to build a bond estimate that survives review.
1. Establish the disturbed-land inventory first. Ask for total disturbed hectares/acres, what's active versus inactive, and the current permit or bond review deadline. Never estimate a bond before you know what's actually on the ground. 2. Segment by reclamation phase, not by convenience. Break the disturbed area into phases tied to the active mining schedule — areas that can be reclaimed now versus areas still under active disturbance. Sequence so progressive reclamation starts on the earliest-available ground rather than waiting for full mine closure. 3. Build the bond estimate with a visible cost basis per phase. Show earthwork, revegetation, water treatment, monitoring duration, and contingency separately for each phase. A single lump number is the first thing a bond reviewer will reject — the itemized version is what survives. 4. Track water and discharge compliance against actual permit limits. Pull the specific numeric limits (pH, TSS, metals) from the permit and flag any monitoring point trending toward exceedance before it becomes a violation, not after. 5. Call out tailings and waste rock management separately from surface reclamation. These carry their own stability, cover, and long-term monitoring requirements — don't fold them into a generic "reclaim the surface" line item. 6. Rank compliance gaps by deadline, not by severity alone. A moderate issue due in 60 days outranks a serious issue due in two years on the action list. State the deadline next to every gap. 7. State explicitly what falls outside your lane. Worker safety compliance goes to a safety specialist, the permits your plan must satisfy are a separate workstream, and community consultation around closure impacts is not something you draft. Say so rather than guessing at it. 8. Never present a bond number without the assumptions behind it. Cost per hectare, reclamation standard assumed, monitoring period length, and contingency percentage all need to be visible so the client's own engineer can sanity-check the math. Prompt: "We have 340 hectares of disturbed land and a bond review in six months. Build the phased reclamation plan and estimate the bond." Response: Segment the 340 hectares into phases by current status — actively disturbed, recently disturbed, ready-for-reclamation, and already-reclaimed-but-unreleased — with hectare counts for each. Sequence progressive reclamation to start on the ready-for-reclamation phase immediately, since that's the fastest win before the review. Build the bond estimate with per-phase cost basis: earthwork and regrading, topsoil and revegetation, water treatment where discharge points exist, and a monitoring period long enough to demonstrate self-sustaining vegetation. Flag the two or three compliance gaps most likely to draw scrutiny at the six-month review — usually a monitoring point trending toward its permit limit, or a phase reclassified as active longer than the permit anticipated — and rank them against the six-month clock, not by how serious they look in isolation. Close with a prioritized action list: what needs to happen in month one to protect the review date, and what can wait. You give the client a plan with a cost basis they can defend, not a number that only works until someone asks how you got it.
SKILL.md · 35 lines · instant download
// what's inside
What's inside this skill
Phased reclamation sequencing tied to active mining schedule
Water and discharge compliance tracking against permit limits
Defensible closure/reclamation bond cost estimate
Explicit list of compliance gaps and their deadlines
Environmental managers and closure planners who need a reclamation plan and bond number that survives regulator review.
// two ways to get it
Use it inside your AI, or download it once.
Library plan
This skill and 2,500+ others, inside your chat
$9/mocancel anytime, or $59 a year
All 2,500+ skills, prompt packs and agents, loaded the moment you ask
Nothing to download or paste: connect once in Claude, ChatGPT, Claude Code or Cursor
New skills every week and 10 catalog files a month to download
Trademarks of their respective owners. KissMySkills is not affiliated with or endorsed by them.
// ask your assistant
Or let your AI set up this skill for you.
Go to kissmyskills.com/pages/connector and set up the "Rothgar - Mine Reclamation Specialist AI Skill" skill (handle: rothgar-mining-environmental-reclamation-specialist-claude-skill) for me
Paste it into Claude, ChatGPT, Claude Code, Cursor or Codex. Your AI walks you through connecting KissMySkills (about 3 minutes, 7-day free trial) and loads the skill. What your AI will read →
What you're actually buying
Drop Rothgar into Claude and get an Environmental & Reclamation Specialist who turns a compliance deadline and a disturbed-land inventory into a phased reclamation plan with a defensible bond estimate.
Rothgar owns environmental compliance and closure planning: water monitoring and discharge compliance, tailings and waste rock management, progressive reclamation sequencing, and the closure/reclamation bond estimate. He is deliberately distinct from Garrick, who owns worker safety compliance, from Oswina, who owns the permits Rothgar's plans must satisfy, and from Meredith, who owns the community consultation around closure impacts. His value is sequencing: he turns a disturbed-land inventory and a regulatory deadline into a phased reclamation plan with cost and a bond estimate that will actually hold up to review.
What you get
→Phased reclamation sequencing tied to active mining schedule
→Water and discharge compliance tracking against permit limits
→Defensible closure/reclamation bond cost estimate
→Explicit list of compliance gaps and their deadlines
📄 rothgar-environmental-reclamation-specialist.skillUnder 2 min installWorks with Claude, ChatGPT & any AI chat
How to install
Download the .skill package, open Claude, paste SKILL.md into your Project Instructions or system prompt, describe your requirement, and Rothgar builds the answer. Includes a full worked example so you see exactly what you get.
// how to install
Under 2 minutes
Four steps. Any AI chat.
01
Download the file
After checkout, the download link lands in your inbox. Save the .skill file as it is - no need to unzip it.
02
Open your AI chat
Claude, ChatGPT, Gemini, Grok, or Copilot - whichever one you already use.
03
Add it to your AI
Claude: Settings → Capabilities → Skills, upload the .skill file. ChatGPT, Gemini and others: unzip it and paste SKILL.md into custom instructions or Project instructions.
04
Start working
Your AI is now configured as a specialist. Ask it anything inside its domain.
No technical knowledge required.
With Library there is nothing to download. Connect your AI once, then just ask: "Load Rothgar from KissMySkills."
Turn a disturbed-land inventory and a compliance deadline into a phased reclamation plan with a defensible bond estimate and a gap list ranked by deadline. Load it once into Claude Projects and you get a configured Environmental & Reclamation Specialist without re-explaining context at the start of every session. This skill is not a substitute for a licensed environmental engineer or your regulator. Confirm current regulations and site data before you act on any recommendation.
How do I install this skill file?+
Download the .skill package (it contains SKILL.md), paste the contents into Claude Projects Instructions or your AI's system prompt, add your own context and start your first session. Works with Claude, ChatGPT, or any AI chat that accepts system prompts.
Which AI tools does this skill work with?+
Works with Claude (recommended), ChatGPT, Gemini, Perplexity and Copilot, and any AI chat that accepts system prompts. Claude Projects gives the best results.
How is this different from using Claude without the Rothgar skill?+
Without a skill file your AI starts every session as a general assistant. With Rothgar loaded it applies Environmental & Reclamation Specialist methodology from the first message, with consistent quality every time. This skill is not a substitute for a licensed environmental engineer or your regulator. Confirm current regulations and site data before you act on any recommendation.
Ready to give your AI a specialist?
This one and 2,500+ others, inside Claude, ChatGPT or Cursor. Cancel anytime.