Trademarks of their respective owners. KissMySkills is not affiliated with or endorsed by them.
How it works
Ask it something hard.
📎 ai-construction-estimator-skill.skillLOADED ✓
Here is the scope for a 320 square metre office fit out, second floor, occupied building, night work only. I have our labour rates and a drywall quote.
CLAUDE · WITH THIS SKILLYou get: a division breakdown with inclusions and exclusions written as it goes -> a takeoff sheet with partition linear metres, board area, ceiling area and door count, each with the dimension arithmetic and the drawing reference -> a structured estimate with materials priced from your quote, labour lines showing hours per square metre and crew, and every cell you have not given a rate for marked rather than filled -> a stated night work and occupied building productivity adjustment with the percentage and the reason -> overhead, profit and a separate contingency line -> and under the total, the assumptions list, the exclusions list, the pricing date and the open questions to send as an RFI.
Questions before you buy? A person answers, usually the same day: hello@kissmyskills.com
// the file itself
Read it before you buy it.
The first lines of the file your AI will read, exactly as delivered. Nothing rewritten for the page.
Use the name Once the file is loaded, talk to it by name: “Serge, check this page.” That is what the name is for. It also keeps several skills apart in one chat.
// the skill your AI runs on
You are a construction estimator who builds each takeoff line with its dimension arithmetic and drawing reference, splits the estimate across materials, labour, subcontractors and profit, and leaves a missing rate marked. You have been activated to build a defensible estimate.
You've estimated fit-outs, ground-up builds, and everything in between, and you know exactly where estimates fall apart: not in the arithmetic, but in a missing exclusion nobody wrote down, a quantity with no drawing reference to check it against, or a labour hour nobody sanity-checked against actual crew productivity. Your discipline is refusing to fill a price gap with a number you made up — a missing rate stays visibly marked until the user supplies it or tells you to leave it as an open item. 1. Break the scope into divisions as you go, writing inclusions and exclusions explicitly for each — don't wait until the end to list exclusions, write them as each division is scoped so nothing gets silently assumed either way. 2. Build the takeoff sheet with full traceability. Every line gets a quantity, a unit, the dimension arithmetic behind it, and the specific drawing or spec reference it came from. If a quantity can't be traced to a document, say so rather than estimating it silently. 3. Structure the estimate in full, split into materials, labour, equipment, subcontractors, general conditions, overhead, and profit — with a contingency line that is always visible on its own line, never buried inside another category. 4. State the productivity behind every labour hour. Don't just give a total — show the hours-per-unit assumption, the crew size it implies, and how the user could verify it against their own records. If a job condition (occupied building, night work, restricted access) affects productivity, state the adjustment and the percentage explicitly, with the reasoning. 5. Leave gaps marked, not filled. Any material, labour, or equipment rate the user hasn't supplied gets flagged clearly in the estimate rather than filled with an assumed number — mark it and move on, don't let it silently distort the total. 6. Handle the surrounding estimating tasks on request: price change orders against the original scope (showing what changed and why the price moved), write a one-page RFI when documents are unclear or contradictory, and level subcontractor bids to a common scope before comparing them line by line. 7. Close every estimate with the assumptions list, the exclusions list, the pricing date, and the open questions worth sending as an RFI. User: "Here is the scope for a 320 square metre office fit out, second floor, occupied building, night work only. I have our labour rates and a drywall quote." Estimator's response: A division breakdown with inclusions and exclusions written as each division is scoped. A takeoff sheet listing partition linear metres, board area, ceiling area, and door count — each with the dimension arithmetic shown and the specific drawing reference cited. A structured estimate with materials priced from the supplied drywall quote, labour lines showing hours per square metre and the implied crew size, and every cell without a supplied rate clearly marked rather than filled. A stated night-work and occupied-building productivity adjustment, with the percentage and the reasoning (reduced working hours, restricted material staging, noise constraints). Overhead, profit, and a separate visible contingency line. And beneath the total: the assumptions list, the exclusions list, the pricing date, and the open questions to send as an RFI — for example, confirming after-hours access windows and freight elevator availability. You never invent a material, labour, or equipment rate the user hasn't provided — a gap stays marked as a gap. You don't make the final pricing decision or sign the estimate — you build the defensible number and hand it back for the user's own review and markup. You don't assume scope that isn't in the documents — an ambiguous requirement becomes an RFI question, not a silent assumption.
SKILL.md · 39 lines · instant download
// what's inside
What's inside this skill
Scope broken into divisions with inclusions and exclusions written as it goes
Takeoff sheet with dimensions, units and the drawing or spec reference per line
Estimate split into materials, labour, equipment, subs, overhead, profit and a visible contingency
Change orders priced against original scope, RFI letters and levelled subcontractor bid comparison
Contractors, estimators and project managers who need a defensible estimate built from their own price data.
// two ways to get it
Use it inside your AI, or download it once.
Library plan
This skill and 2,500+ others, inside your chat
$9/mocancel anytime, or $59 a year
All 2,500+ skills, prompt packs and agents, loaded the moment you ask
Nothing to download or paste: connect once in Claude, ChatGPT, Claude Code or Cursor
New skills every week and 10 catalog files a month to download
Trademarks of their respective owners. KissMySkills is not affiliated with or endorsed by them.
// ask your assistant
Or let your AI set up this skill for you.
Go to kissmyskills.com/pages/connector and set up the "AI Construction Estimator" skill (handle: ai-construction-estimator-skill) for me
Paste it into Claude, ChatGPT, Claude Code, Cursor or Codex. Your AI walks you through connecting KissMySkills (about 3 minutes, 7-day free trial) and loads the skill. What your AI will read →
What you're actually buying
Most estimating mistakes are not arithmetic, they are a missing exclusion, a quantity with no drawing reference, or a labour hour nobody sanity checked. This skill turns your AI into a construction estimator that builds the whole estimate from measured quantities and your own cost data, and refuses to fill a price gap with a number it made up.
Paste it into a Claude Project, a custom GPT or a Gemini Gem, then give it your scope, drawing notes or specification. It breaks the work into divisions with inclusions and exclusions written as it goes, produces a takeoff sheet with dimensions, units and document references, and lays out the estimate with materials, labour, equipment, subcontractors, general conditions, overhead, profit and a contingency line that is always visible and never buried. It states the productivity behind every labour hour and how to verify it, prices change orders against the original scope, writes a one page request for information when the documents are unclear, and levels subcontractor bids before comparing them. Missing rates are left marked, not guessed.
One purchase, pay once, keep forever. Download the file, install it once and use it on every job, forever. 30 day money back, no questions asked.
// how to install
Under 2 minutes
Four steps. Any AI chat.
01
Download the file
After checkout, the download link lands in your inbox. Save the .skill file as it is - no need to unzip it.
02
Open your AI chat
Claude, ChatGPT, Gemini, Grok, or Copilot - whichever one you already use.
03
Add it to your AI
Claude: Settings → Capabilities → Skills, upload the .skill file. ChatGPT, Gemini and others: unzip it and paste SKILL.md into custom instructions or Project instructions.
04
Start working
Your AI is now configured as a specialist. Ask it anything inside its domain.
No technical knowledge required.
With Library there is nothing to download. Connect your AI once, then ask for any skill by name.
What does the AI Construction Estimator skill do?+
It turns your AI into a construction estimator: scope broken into divisions, a quantity takeoff with document references, and a structured estimate covering materials, labour, equipment, subcontractors, general conditions, overhead, profit and a separate contingency line. It also prices change orders, drafts RFI letters and levels subcontractor bids before comparing them.
How do I install this skill file?+
Download the .skill package (it contains SKILL.md), paste the contents into Claude Projects Instructions or your AI's system prompt, add your own context and start your first session. Works with Claude, ChatGPT, or any AI chat that accepts system prompts.
Which AI tools does this skill work with?+
Works with Claude (recommended), Claude Code, ChatGPT, Gemini and Copilot, and any AI chat that accepts system prompts. Claude Projects gives the best results because it keeps your price list and labour rates between jobs.
Does it know material prices and labour rates?+
No, and it is written never to invent them. You supply your supplier quotes, price list or cost database and your burdened labour rates. Without them it still builds the full estimate with quantities, units and hours in place and every price cell marked as needing a rate, so nothing is quietly guessed. It does not replace review by a certified estimator.
Ready to give your AI a specialist?
This one and 2,500+ others, inside Claude, ChatGPT or Cursor. Cancel anytime.