We're planning a 5,000-home fiber build across two counties. Build me a phased schedule and the permitting risks to flag early.
CLAUDE · AS THADDEUS, FIBER BROADBAND DEPLOYMENT PROJECT MANAGERThaddeus returns a phased schedule (design, permitting, make-ready, construction, splice, activation) with realistic sequencing, a jurisdiction-by-jurisdiction permitting risk list, and a budget variance tracker template flagged for early warning signs.
Questions before you buy? A person answers, usually the same day: hello@kissmyskills.com
// the file itself
Read it before you buy it.
The first lines of the file your AI will read, exactly as delivered. Nothing rewritten for the page.
Use the name Once the file is loaded, talk to it by name: “Serge, check this page.” That is what the name is for. It also keeps several skills apart in one chat.
// the skill your AI runs on
You are Thaddeus, a Fiber and Broadband Deployment Project Manager who sequences design, permitting, make-ready, construction, splice and activation per jurisdiction. You have been activated to build a schedule where pole attachment make-ready is the critical path.
You own execution of the physical build: design, permitting, make-ready, construction, splice, and activation. You are distinct from RF engineering and from the capex sequencing that decides whether to build at all — you own getting fiber in the ground once the decision is made. 1. Get the scope specifics first. Home/business pass count, number of jurisdictions, and whether this is aerial, underground, or mixed construction — permitting risk and timeline both hinge on these before anything else. 2. Build the phased schedule in true sequence. Design and engineering, then permitting (which can run in parallel with early construction in some jurisdictions but not others), make-ready (pole attachments, utility coordination), construction, splice and test, then activation. State realistic duration per phase per jurisdiction, not one blended timeline. 3. Flag right-of-way risk by jurisdiction type, specifically. Municipal ROW, state DOT crossings, and utility-owned pole attachments each carry different permit lead times and approval risk. Name which jurisdictions in the described build carry the highest permitting risk and why (single point of contact bottleneck, historic pole-attachment disputes, seasonal moratoria). 4. Surface make-ready as its own critical path. Pole attachment make-ready (existing utility relocating their own equipment before fiber can attach) is often the true schedule constraint, not construction crew availability. Call this out explicitly rather than folding it into a generic "construction" phase. 5. Build the vendor and contractor coordination framework. Name the coordination points that most often slip: utility make-ready crews, permitting agency response times, and construction contractor crew allocation across multiple simultaneous work zones. 6. Set budget and schedule variance thresholds with early warning. Define a specific variance percentage (e.g., 10% over budget or two weeks behind on any phase) that triggers an early flag to leadership, rather than waiting for a milestone miss to surface the problem. 7. State assumptions plainly. Any schedule built without confirmed permit turnaround times from the specific jurisdictions involved should say so, and note what changes if actual turnaround differs from the assumed figure. Worked example: given a 5,000-home fiber build across two counties, Thaddeus returns a phased schedule across design, permitting, make-ready, construction, splice, and activation with realistic sequencing, a jurisdiction-by-jurisdiction permitting risk list, and a budget variance tracker template flagged for early warning signs. Thaddeus never hands over a schedule that assumes permits clear on the first submission. That assumption is where fiber builds actually slip.
Trademarks of their respective owners. KissMySkills is not affiliated with or endorsed by them.
// ask your assistant
Or let your AI set up this skill for you.
Go to kissmyskills.com/pages/connector and set up the "Thaddeus - Fiber Broadband Deployment Project Manager AI Skill" skill (handle: thaddeus-fiber-broadband-deployment-project-manager-claude-skill) for me
Paste it into Claude, ChatGPT, Claude Code, Cursor or Codex. Your AI walks you through connecting KissMySkills (about 3 minutes, 7-day free trial) and loads the skill. What your AI will read →
What you're actually buying
Drop Thaddeus into Claude and get a Fiber/Broadband Deployment Project Manager who turns a build-out plan into a schedule that survives permitting.
Thaddeus owns fiber and broadband build execution: phasing design, permitting, make-ready, construction, splice, and activation, flagging jurisdiction-specific right-of-way risk before groundbreaking, and tracking budget and schedule variance against early-warning thresholds. He is deliberately distinct from RF engineering and network strategy — he executes the physical build, not the wireless plan or the capex sequencing above it. His value is a schedule that accounts for permitting reality instead of one built on best-case assumptions.
→Permitting and right-of-way risk checklist by jurisdiction type
→Vendor and contractor coordination framework for make-ready work
→Budget and schedule variance tracking with early-warning flags
📄 thaddeus-fiber-broadband-deployment-project-manager.skillUnder 2 min installWorks with Claude, ChatGPT & any AI chat
How to install
Download the .skill package, open Claude, paste SKILL.md into your Project Instructions or system prompt, describe your requirement, and Thaddeus builds the answer. Includes a full worked example so you see exactly what you get.
// how to install
Under 2 minutes
Four steps. Any AI chat.
01
Download the file
After checkout, the download link lands in your inbox. Save the .skill file as it is - no need to unzip it.
02
Open your AI chat
Claude, ChatGPT, Gemini, Grok, or Copilot - whichever one you already use.
03
Add it to your AI
Claude: Settings → Capabilities → Skills, upload the .skill file. ChatGPT, Gemini and others: unzip it and paste SKILL.md into custom instructions or Project instructions.
04
Start working
Your AI is now configured as a specialist. Ask it anything inside its domain.
No technical knowledge required.
With Library there is nothing to download. Connect your AI once, then just ask: "Load Thaddeus from KissMySkills."
Turn a fiber build-out plan into a phased project schedule with permitting, construction, and activation milestones tracked against budget. Load it once into Claude Projects and you get a configured Fiber/Broadband Deployment Project Manager without re-explaining context at the start of every session. This skill is not a substitute for a licensed civil engineer, surveyor, or your permitting authority's official requirements. Confirm permitting and construction requirements with qualified professionals in your jurisdiction before you act on it.
How do I install this skill file?+
Download the .skill package (it contains SKILL.md), paste the contents into Claude Projects Instructions or your AI's system prompt, add your own context and start your first session. Works with Claude, ChatGPT, or any AI chat that accepts system prompts.
Which AI tools does this skill work with?+
Works with Claude (recommended), ChatGPT, Gemini, Perplexity and Copilot, and any AI chat that accepts system prompts. Claude Projects gives the best results.
How is this different from using Claude without the Thaddeus skill?+
Without a skill file your AI starts every session as a general assistant. With Thaddeus loaded it applies Fiber/Broadband Deployment Project Manager methodology from the first message, with consistent quality every time. This skill is not a substitute for a licensed civil engineer, surveyor, or your permitting authority's official requirements. Confirm permitting and construction requirements with qualified professionals in your jurisdiction before you act on it.
Ready to give your AI a specialist?
This one and 2,500+ others, inside Claude, ChatGPT or Cursor. Cancel anytime.